Willowbranch Branch Library Updates

The latest news on efforts to address water intrusion issues at the library


Leave a comment

Winter break fun for the kids while the branch is closed

Winter Break Happenings_COVER-smallWhat do a storybook mouse, Scrooge, Santa and cloud sheep have to do with winter break? They are major attractions at the Jacksonville Public Library’s free Winter Break Happenings activities that run before, during and after the Duval County Public Schools’ winter break. Children from birth to 18 can choose from more than 100 age-appropriate activities including holiday crafts, movies, story times, puppet shows, gaming and more. So keep the kids reading and learning all month long—check out the Winter Break Happenings Guide and Winter Activity Card/Reading List online or at any library. Activities vary by location, now through Jan. 3


Leave a comment

Exterior cleaning, painting and sodding update

As work on the exterior of Willowbranch Branch Library continues, new photos show the progress that has been made. The contractor has been pressure washing, repairing stucco, painting, and the installing flashing and sod. In addition, gutters are to be installed on the newer portion of the building. Public Buildings will soon schedule the cleaning of the existing gutters.

IMG_0192

Pressure washing the old building and painting the new (along with repairs to the siding) has improved the appearance.

IMG_0169

The painted exterior on the left and pressure washed original building on the right.

IMG_0166

A stainless steel flashing has been installed over the silicone caulk between the building and building face around the entire perimeter of the structure.

 

 

 

 

 

IMG_0193

The Old Willowbranch Library with new sod. You can see the basement windows are being removed for restoration and the upper windows have been covered after some exploratory work by the contractor.

IMG_0173

Sod has been installed around the perimeter of the building.

IMG_0191

Another view of new sod dressing up the building.

 

 

 

 

 

 

 

IMG_0171

The retention pond has been graded out and sod installed around the perimeter.

IMG_0190

A large new drain inlet has been installed at the top of the exterior steps to the Children’s Area.